This is what I have been doing today, Preparing fabrics and batting for the McGrath Foundation, The Pink Project. I have drawn the fronts and cut out the backs for 12, I plan on making two a month and then posting them off in batches. Taking a bit of a break right now, then back to do the next 12. All set for next years weekend projects. I have a box for them to be in marked PINK PROJECT. The down side of getting it all ready to go? The marker is pretty strong smelling.
Thursday, November 16, 2017
Subscribe to:
Posts (Atom)