Thursday, November 16, 2017

Pink Project. The Magrath Foundation.

This is what I have been doing today, Preparing fabrics and batting for the McGrath Foundation, The Pink Project. I have drawn the fronts and cut out the backs for 12, I plan on making two a month and then posting them off in batches. Taking a bit of a break right now, then back to do the next 12. All set for next years weekend projects. I have a box for them to be in marked PINK PROJECT. The down side of getting it all ready to go? The marker is pretty strong smelling.

1 comment: